Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Soldier Creek Cabin Project
#4
Glad To Help. FYI, Sometimes they require a perk test, No big deal, You just need to dig a 8-10' deep hole in the desired locale for your septic. The health inspector will come and do an inspection to see what the water table is doing ect...Different health depts. have different requirements. They will also tell you how much leach field will be required. ( A trench with a gravel bottom, seep cloth , and perforated drain pipe, length of trench will be determined by the health dept. and can be run zig zag at a 1/4" per foot min drainage generally)
Your water supply line needs to be soft copper, what ever size is coming off the meter, 3/4-1 ". needs to be buried below frost line (generally 30" but may be more up there) It will need to be one piece from the meter to the in house connection. solder at the meter will need to be 95/5% silver solder (no led)
Let me know if you need info, I'm glad to help.
Lonnie c-801-819-2111
[signature]
Reply


Messages In This Thread
Soldier Creek Cabin Project - by Lundman - 04-07-2016, 03:21 PM
Re: [Lundman] Soldier Creek Cabin Project - by Lonnie - 04-11-2016, 07:15 PM

Forum Jump:


Users browsing this thread: 1 Guest(s)