03-12-2014, 03:15 AM
Idaho power is putting a lot of money into it. 20 campsites total, 15 below dam, 5 above. New ramps above and below, some dredging on the below dam side so you can get to the river without making a big loop. The area by the old boarding house is getting redone, there will be mooring and such now. As of now it is scheduled to start July 1st and end middle December. If your a member of the associated general contractors you can probably go to the plan room and take a look.
[signature]
[signature]