08-23-2012, 10:53 PM
You really need a double action pump. You can cut the time in half with one.
I use the K-Pump to top off, but with the LVM and the top off it takes 3 minute total.
Informative video.
I had the same idea on the PVC rod holders but went with the glue ons...only cause they look so cool...LOL
Pluse I recommend an air gauge, specially on these V shaped pontoons. Equal air in each side, like car tires.
[signature]
I use the K-Pump to top off, but with the LVM and the top off it takes 3 minute total.
Informative video.
I had the same idea on the PVC rod holders but went with the glue ons...only cause they look so cool...LOL
Pluse I recommend an air gauge, specially on these V shaped pontoons. Equal air in each side, like car tires.
[signature]