Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
chinook on redds in Snake...thanks Nez Perce and others
#41
Only misinformation I am seeing is their value. They produce enough power to serve the entire Seattle area..... That's a lot of electricity. Cost to tear out, then replace them with a different power source is estimated at 500-750 million dollars. And even then to make the power source produce the same type of load supply it would need to be natural gas, not a renewable like hydro is . Which would also drive up your natural gas costs in those areas. Those costs don't even include monies to deal with sediment control. That's a lot of money that has to come from some place.

Pierce has one of the best takes on it imo.
[signature]
Reply


Messages In This Thread
Re: [LSR83] chinook on redds in Snake...thanks Nez Perce and others - by Bmarsh - 03-10-2012, 02:32 AM

Forum Jump:


Users browsing this thread: 1 Guest(s)