04-05-2011, 05:20 AM
[quote jimpete525]They shut down the head gates so they can do maintenance.[/quote]
bingo, they leave the great feeder canal flowing all winter but they shut it down for a short space of time in april to do the pre irrigation season maint. on it.
[signature]
bingo, they leave the great feeder canal flowing all winter but they shut it down for a short space of time in april to do the pre irrigation season maint. on it.
[signature]