03-28-2011, 04:02 AM
had to empty the boat from the last storm , snow and ice , no damage at the seams, the temperature is below freezing .
measured the ribs, cut boards to length and numbered them , located bolt holes , drilled and counter-bored the holes, painted and installed the slats, placed flooring for the first two sections on the slats to locate good spots to drain any water in the future with the shop vac, sides of the boat were marked where the floor slats are mounted when I go to screw the flooring to them.
[signature]
measured the ribs, cut boards to length and numbered them , located bolt holes , drilled and counter-bored the holes, painted and installed the slats, placed flooring for the first two sections on the slats to locate good spots to drain any water in the future with the shop vac, sides of the boat were marked where the floor slats are mounted when I go to screw the flooring to them.
[signature]