03-24-2007, 12:06 AM
This is my first attempt at building a backyard playhouse. I started with 4-14' 4x4's cemented 2' in the ground and worked my way up without a drawing or blueprint. Thus far i am only into materials about $200 and about 3 full days of work. To buy one comparable would cost a grand. Granted it is not as perty as the kits but it is built from the heart and my brain alone. Not to mention a $700 savings. It is supposed to be for my sons b-day on april 1, but there is no way i can keep him off of it. It still has a rock climbing wall, sand box, staircase, steering wheel, and later on a swing to be added on. What does everybody think?
[signature]
[signature]