02-25-2007, 08:52 PM
the problem with getting the dike fixed is its a goverment load of crap. just like when the south marina was bone dry ya think the idiots would have put a couple loaders and track hoes in could have cleanedthe whole thing in a couple days. not those idiots they waited till it filled then dredeged.
[signature]
[signature]
