10-27-2005, 09:33 PM
The
part of the whole thing is the Berry received a large amount of water from the tribs. It should have been close to full right now. I hope we don't start robbing that reservoir each year like we do on the Weber drainage. This year is the first year since the tunnel was finished and we should have gained quite a bit. Not stay at the same level as last.
[signature]

[signature]