Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Lincoln Beach Utah Lake early morning float
#10
[cool][#0000ff]There are several options. I run a length of stretch cord between the two D rings on one side of the bottom, then stretch it as shown up to a hook. At least that is the old way. When I post my new design, there is a carabiner run through a hole in the baseboard material and I just hook the loop of cord in it. With your design, you could drill and crimp S hooks in the bottom of each tube...or you could tie on a carabiner with a loop of cord around the cross tube. It does not have to ride centered. On my first designs, I only hooked one tube and it worked fine.[/#0000ff]
[signature]
Reply


Messages In This Thread
Re: [cat_man] Lincoln Beach Utah Lake early morning float - by TubeDude - 07-15-2005, 05:45 PM

Forum Jump:


Users browsing this thread: 1 Guest(s)