28 October 2021 - Day 4
Now that the rainy days have passed and we’ve had a good day to dry out the ground some, we finished up installing the panels. Due to all our ‘adjustments’ to its size, this took a full day as even the panels needed to trimmed a bit, but we got it done. We still haven’t cleared out the summer growth so it may be hard to tell in the picture, but it’s a sneak peak of the inside (blue tarp area) – we haven’t built the raised beds yet, and the addition will be accessed by going through original and it will have u-shaped beds with a walk way in the center. So, it’s now a 10x20 greenhouse. Still need to do some reinforcements like we did in did in the original.
![[Image: 20211028-Day4a.jpg]](https://i.postimg.cc/phf4SkJV/20211028-Day4a.jpg)
![[Image: 20211028-Day4b.jpg]](https://i.postimg.cc/9wcKHTLd/20211028-Day4b.jpg)
Now that the rainy days have passed and we’ve had a good day to dry out the ground some, we finished up installing the panels. Due to all our ‘adjustments’ to its size, this took a full day as even the panels needed to trimmed a bit, but we got it done. We still haven’t cleared out the summer growth so it may be hard to tell in the picture, but it’s a sneak peak of the inside (blue tarp area) – we haven’t built the raised beds yet, and the addition will be accessed by going through original and it will have u-shaped beds with a walk way in the center. So, it’s now a 10x20 greenhouse. Still need to do some reinforcements like we did in did in the original.
![[Image: 20211028-Day4a.jpg]](https://i.postimg.cc/phf4SkJV/20211028-Day4a.jpg)
![[Image: 20211028-Day4b.jpg]](https://i.postimg.cc/9wcKHTLd/20211028-Day4b.jpg)