Fishing Forum
Framing Job out of the heat - Printable Version

+- Fishing Forum (https://bigfishtackle.com/forum)
+-- Forum: Utah Fishing Forum (https://bigfishtackle.com/forum/forumdisplay.php?fid=386)
+--- Forum: Off Topic Board (https://bigfishtackle.com/forum/forumdisplay.php?fid=112)
+--- Thread: Framing Job out of the heat (/showthread.php?tid=1018240)



Framing Job out of the heat - Lundman - 07-11-2017

In the next three weeks I will be finishing the concrete portion of the Sun Room addition and covered patio on my cabin up at Strawberry - then I will be ready to hire a general contractor or knowledgeable framer for a job that should take a crew of two or three approx. one week to finish. Person must be able to pass Wasatch County inspections, read prints, and know how to square up a window(s) opening. The good thing is I have all the tools and will be on-site during most of the construction. And as they say cash talks... Send me a P.M. if you have someone in mind - thanks
[signature]